cpm Scheduling
The industry is constantly changing. The range and depth of information required to effectively plan a project can be overwhelming. Success depends heavily on highly detailed advance planning. The key to intelligent planning is accurate scheduling. Warner has demonstrated a consistently high level of precision in this critical area.
At Warner, each schedule becomes a custom-designed plan tailored to fit the unique features of the project as well as the capabilities and resources of the owner, developer, contractor or construction manager.
Our scheduling consultants can:
- Establish a realistic period of performance using normal, fast track or multi-phase techniques
- Identify long-lead and schedule-sensitive materials and equipment
- Develop a Project Master Schedule delineating all parties’ to the project performance obligations
- Prepare the initial As-Planned Baseline Schedule;
- Update progress reports and monitor performance;
- Pinpoint potential and actual problem areas, and suggest solutions;
- Determine the impact of delays caused by late delivery of materials, design changes, abnormal weather, strikes or other factors; and
- Recommend time extensions where justified.
Warner utilizes a variety of scheduling techniques to suit the needs of the smaller specialty contractor or the largest owner/developer. Our scheduling group, recognized as among the best in the industry, will prove indispensable to your team.